the 2 u/g drill rigs are powering away at an average rate of 22 metres - 28 metres each per day.
as the rigs are drilling 100 - 150 metres holes that would equal 2 - 3 holes total per week (with the drill crew working 12 hour days / 7 days a week).
apparently it is easier drilling thru the dyke & harder thru the sedimentary rock.
also, the drill crews drill slower thru the quartz reef.
it all adds up to a lot of gold bearing core up to the lab for assaying.
MCO Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held