the chinguetti 4-5 appraisal/early development wel

  1. 39 Posts.
    Progress(previous 7days to 9/9/03)The well,located in 820m of water,was spudded on 4 September and an 18inch(457mm) hole was drilled to 1,683m.The 13? inch(340mm)casing was run and cemented.Current operation is installing the blowout preventers(BOPs) My question is what is the total depth of drilling,and a time frame roughly for production testing any comments anyone cheers steve
 