    The scope of this exercise is limited to the volume of rock between barn-burner holes BR-1-17 and BR-2-18. It is important to note that the following estimate is intended to capture just the tonnage and value created by the step out hole BR-2-18. The volume of rock represents just a fraction of the total mineralized area and the actual resource estimate 1H19 is likely to far exceed the estimates rendered below.


    TONNAGE

    Per the drill announcement, BR-2-18 was drilled 80m down dip and 50m down plunge from hole BR-1-17.

    See excerpt from the announcement below:



    BR-1-17 was drilled at -90° dip angle so the 64m intercept should be close to true vertical thickness. However, BR-2-18 was drilled at a -60° dip angle. To calculate true vertical thickness we can use basic function 64m * COS (60) = 32m. The blended average is 48m.

    Therefore we assume dimensions as follows:

    - 50m strike
    - 80m lateral width
    - 48m vertical thickness

    As for density, I use the weighted average of sphalerite (3.6t/m^3) and barite (4.4t/m^3) which give me a specific gravity of 4t/m^3.

    Tonnage is calculated as follows:

    50m strike * 80m lateral width * 48m vertical thickness * density of 4t/m^3 = 768,000 tonnes


    GRADE

    You can see in the long-section below that grade continuity is excellent for at least 150m from BR-7-17 to BR-2-18.



    However, for this exercise, we only care about how many tonnes and the value added therein as a result of this stepout hole.

    BR-1-17: 8.5% Zn, 5.1% Pb, 374g/t Ag, 2.3g/t Au, 1.0% Cu
    BR-2-18: 10.5% Zn, 7.7% Pb, 537g/t Ag, 4.4g/t Au, 0.9% Cu

    Weighted average: 9.2% Zn, 6% Pb, 428g/t Ag, 3.0g/t Au, 1% Cu


    POTENTIAL REVENUES

    Input assumptions:







    Throw it all in the blender and I get the following revenue per tonne mined for each of the three saleable concentrates:

    - Zn Concentrate = US$175.14 per mined tonne
    - Pb Concentrate = US$221.44 per mined tonne
    - Cu Concentrate = US$109.93 per mined tonne

    Total revenue per mined tonne = $506.51 per mined tonne

    If we multiply by tonnage = $506.51 * 768,000t = $389M


DISCLAIMER:
Before making any financial decisions based on what you read, always consult an advisor or expert.

The HotCopper website is operated by Report Card Pty Ltd. Any information posted on the website has been prepared without taking into account your objectives, financial situation or needs and as such, you should before acting on the information or advice, consider the appropriateness of the information or advice in relation to your objectives, financial situation or needs. Please be aware that any information posted on this site should not be considered to be financial product advice.

From time to time comments aimed at manipulating other investors may appear on these forums. Posters may post overly optimistic or pessimistic comments on particular stocks, in an attempt to influence other investors. It is not possible for management to moderate all posts so some misleading and inaccurate posts may still appear on these forums. If you do have serious concerns with a post or posts you should report a Terms of Use Violation (TOU) on the link above. Unless specifically stated persons posting on this site are NOT investment advisors and do NOT hold the necessary licence, or have any formal training, to give investment advice.

Top

Thank you for visiting HotCopper

We have detected that you are running ad blocking software.


HotCopper relies on revenue generated from advertisers. Kindly disable your ad blocking software to return to the HotCopper website.

I understand, I have disabled my ad blocker. Let me in!

Need help? Click here for support.