88E 0.00% 0.9¢ 88 energy limited

Rig move starts 15th Feb to Charlie-1 location

  1. 167 Posts.
    lightbulb Created with Sketch. 112
    Rig move to drilling site confirmed to commence on 15th Feb.

    https://aktrucks.org/info-for-haul-rd-group-dalton-drill-rig-move/

    Info for Haul Rd Group – Dalton Drill Rig Move*** Early Notice – Permits Still in Process ***Starting Saturday, Feb. 15, at 12 a.m., Accumulate Energy Alaska, Inc., in partnership with Cruz Construction and Nordic, will begin moving a large drill rig on the Dalton Highway from Deadhorse to mile 386. The move is anticipated to last through Monday, Feb. 17, at 12 p.m.Traffic will not be able to pass the drill rig during the move. The rig is large enough that it requires both lanes of the highway to travel and it will be traveling at low speeds. Drivers should anticipate lengthy delays.Road closures will be established during the move to control traffic. Over the three day move, the drill rig will pull into pullouts in three locations and waiting traffic will be permitted to travel through. These are the locations and anticipated times:
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $109.4M
Open High Low Value Volume
0.9¢ 0.9¢ 0.8¢ $182.3K 20.39M

Buyers (Bids)

No. Vol. Price($)
579 281517231 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 17229779 23
View Market Depth
Last trade - 16.10pm 26/02/2021 (20 minute delay) ?
(live)
Last
0.9¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
0.9¢ 0.9¢ 0.9¢ 21308655
Last updated 15.48pm 26/02/2021 (live) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.