Progress Report for Woodada #19 Well ,Tues, 23/4/2

  1. Same depth as yesterday,1483 metres and working on the rig up BOP's,
    reminds me of a song "Bip BOP a lula,she's my baby..."
    Okay,okay I know don't give up my day time job,thanks.
    ***********************************************************************************************************

    Progress Report for Woodada #19 Well

    Document date: Tue 23 Apr 2002 Published: Tue 23 Apr 2002 12:04:37
    Document No: 214831 Document part: A
    Market Flag: N
    Classification: Progress Report
    HARDMAN RESOURCES LIMITED 2002-04-23 ASX-SIGNAL-G

    HOMEX - Perth

    +++++++++++++++++++++++++
    Hardman Resources Ltd provides the following progress report on the
    drilling of the Woodada #19 gas well. The well is being drilled
    within the Woodada Production Licence (PL 5) located approximately
    260 kilometres north of Perth, Western Australia. Further details
    are:

    PROGRESS:
    Current depth of 1,483 metres KB. Cement 95(5/8) inch (245 mm) (up to
    06:00 hours 22/4/02) casing, rig UP BOP's.

    WELL LOCATION:
    Located to intersect primary reservoir target approximately 700
    metres west of the Woodada #8 gas production well.

    PRIMARY TARGET:
    Gas producing zones within Carynginia Limestone at approximately
    2,200 meters depth.

    SECONDARY TARGETS:
    * Sandstone within basal Carynginia Formation (between 2,400 metres
    to 2,500 metres depth), below the Carynginia Limestone Gas Reservoir.

    * Sandstones within the Irwin River Coal Measures, between 2,530
    metres to 2,800 metres depth.

    * High Cliff Sandstone (if present) at about 2,820 metres depth.

    Note: These secondary objectives below the producing gas reservoir of
    the Woodada Gas Field have not previously been tested.

    HYDROCARBON INDICATIONS:
    Nil. No hydrocarbons are expected above the
    regional sealing Kockatea Formation. Drilling of Woodada #19
    commenced on 11 April 2002. A period of 25 days has been estimated
    for the completion of drilling and testing operations at Woodada #19
    to an approximate total depth of 2,900 metres.

    PARTICIPANTS:
    Hardman Resources Ltd 75%
    Bounty Oil & Gas NL 25%


    S Spencer
    DIRECTOR

    --------------------------------------------------------------------------------

DISCLAIMER:
Before making any financial decisions based on what you read, always consult an advisor or expert.

The HotCopper website is operated by Report Card Pty Ltd. Any information posted on the website has been prepared without taking into account your objectives, financial situation or needs and as such, you should before acting on the information or advice, consider the appropriateness of the information or advice in relation to your objectives, financial situation or needs. Please be aware that any information posted on this site should not be considered to be financial product advice.

From time to time comments aimed at manipulating other investors may appear on these forums. Posters may post overly optimistic or pessimistic comments on particular stocks, in an attempt to influence other investors. It is not possible for management to moderate all posts so some misleading and inaccurate posts may still appear on these forums. If you do have serious concerns with a post or posts you should report a Terms of Use Violation (TOU) on the link above. Unless specifically stated persons posting on this site are NOT investment advisors and do NOT hold the necessary licence, or have any formal training, to give investment advice.

Top