NGE 0.00% 63.5¢ nge capital limited

problem with drilling rig

  1. 1,015 Posts.
    From the report of Oil Search released today.

    As at 31 January 2015, Antelope 4 was
    at a depth of 1,986.7 metres in a
    12-

    1/4” hole. During the month, the well
    was suspended due to issues with the
    WDL Rig 1. Once drilling operations
    resume, the forward plan is to drill
    through and evaluate the reservoir
    section.​
    InterOil Corporation
 
GET SUPPORT arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.