TGN 32.8% 8.5¢ tungsten mining nl

JE2 I checked again and the TABBA plant has a name plate...

  1. 877 Posts.
    lightbulb Created with Sketch. 283
    JE2
    I checked again and the TABBA plant has a name plate processing capacity = 30 tns ph. So its annual nameplate capacity = 30tns ph x 15hrs pd x 7 days pw x 52weeks = 160,000 tns pa. The WO3 grade = 0.18% and the Recovery = 80% so annual WO3 production = 160,000 x 0.18% x 80% = 227 tns.
    So it looks like TGN will only produce a nominal amount of 227 tns pa WO3 at least in initially. I suspect once plant is up & running and all the metallurgical parameters have been proven, then TGN will produce a DFS for a bigger operation. However that road will take at least 3 years to walk.
    Please DYOR
 
watchlist Created with Sketch. Add TGN (ASX) to my watchlist
(20min delay)
Last
8.5¢
Change
0.021(32.8%)
Mkt cap ! $66.84M
Open High Low Value Volume
6.9¢ 8.5¢ 6.9¢ $45.80K 634.1K

Buyers (Bids)

No. Vol. Price($)
1 15000 7.6¢
 

Sellers (Offers)

Price($) Vol. No.
10.0¢ 891 1
View Market Depth
Last trade - 15.51pm 19/03/2024 (20 minute delay) ?
Last
7.2¢
  Change
0.021 ( 9.09 %)
Open High Low Volume
7.0¢ 7.3¢ 7.0¢ 41572
Last updated 13.23pm 19/03/2024 ?
TGN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.