PCL 0.00% 0.2¢ pancontinental oil & gas nl

PCL, BLO, AWE, ITC buying, page-2

  1. 2,070 Posts.
    16 August, 2002
    Long term production testing of the Huinga-1B well, in onshore Taranaki licence PEP 38716, is scheduled to start on August 19, following the recovery of oil from the Kapuni sands last month.

    Marabella Enterprises Ltd, operator for the eight-partner PEP 38716 joint venture, said that surface production facilities for an extended production test would soon be established.

    The testing program will involve several short-term tests in which the well will be flowed for several days and shut-in for similar periods to collect reservoir pressure information.

    These will be followed by longer-term tests designed to evaluate the productivity and size of the oil accumulation. The well has been designed so that the two oil-bearing zones can also be tested separately.

    The Huinga-1B sidetrack well had recovered 21 barrels of oil during a short duration open-hole test from an approximate 18 m interval below 4371 m in the Eocene-aged Kapuni Formation.

    One of the partners Indo-Pacific Energy said this zone was cased and cemented, as was a second zone over the interval 4261-4285m, before a sliding sleeve production assembly was set inside the well to allow long-term production testing of both perforated zones.

    Marabella said the Tariki sandstones, the original well target, remain a prospective target but at a location west of the current well bore.
 
watchlist Created with Sketch. Add PCL (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $10.55M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $1.5K 1M

Buyers (Bids)

No. Vol. Price($)
198 356573855 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 75141216 47
View Market Depth
Last trade - 11.23am 17/09/2021 (20 minute delay) ?
PCL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.