LNC 0.00% 99.5¢ linc energy ltd

observation by a layman

  1. 27,036 Posts.
    lightbulb Created with Sketch. 286

    As impressive as it is that the 6 barrel per day plant is now being commissioned, having seen the photos the sheer size of structures and equipment for just 6 barrel per day astounds me.

    Can anyone tell me whether this trial plant is "out of scale" for such production, perhaps because it is essentially a research facility?

    The mind boggles at the size, complexity and cost of the plant that may be required to commercially produce 20,000 barrels per day ... it'd would have to look like a full sized petrochemical refinery. Are the Chinchilla community and planning/regulators ready for that vision?

    Ucg commercialisation is a long term commitment for the future and I am right behind the concept, but I am trying to be realistic about pathways and time scales for commercialisation.

    Poyndexter

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.