Originally posted by acorn" From what I understand from whoa to...

  1. 4,710 Posts.
    Lead time on a coal fired power station is 6-8 years.  That doesn't stop conservatives with a limited grip on reality who post on HC stating that all Morrison needs to do is build 4-6 coal fired power stations to win the next election.  Yeah, the election in 6 months, that's the one.
 
GET SUPPORT arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.