MPO 0.00% 14.0¢ molopo energy limited

molopo drillingcompleted >>

  1. 3,097 Posts.
    what is next ?
    casing and connecting all wells
    to the production test equipement,
    the pipeline for gas deliveries is almost completed,
    the gas sales contracts are on stand by,


 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.