My contacts tell me that the modified JDC demo plant is close re-commissioning.
I also hear that; partly because permitting new projects has become so difficult in Florida, Mosaic is mining some of the deltas in their tailings storage facilities producing as high-grade phosphate feed as some of their remaining mines. Success with IHP would greatly extend the life of their mines, allowing them to mine lower grade deposits within existing, permitted, mines as well as re-processing their tailings.
Perhaps the future belongs to IHP?
- Forums
- ASX - By Stock
- IHP Plant modification
My contacts tell me that the modified JDC demo plant is close...
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $19.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable
The Watchlist
BGD
BARTON GOLD HOLDINGS LIMITED
Alex Scanlon, Managing Director & CEO
Alex Scanlon
Managing Director & CEO
SPONSORED BY The Market Online