UMC 0.00% $1.30 united minerals corporation nl

further significant marra mamba iron ore

  1. 559 Posts.
    HIGHLIGHTS
    The Company is pleased to announce the presence of significant visual Marra Mamba iron ore mineralisation
    in diamond drill hole UI 201 at the Railway prospect.
    Hole UI 201, located 400 metres east of UI 199 (40metres of significant visual Marra Mamba iron ore
    mineralisation reported 21-02-08) has intersected 30 metres of significant visual Marra Mamba iron ore
    mineralisation between 38 and 68 metres vertical depth. The hole was completed at 68.78m ending in BIF.
    Hole UI 202, located 320 metres north of UI 199, has also intersected visual Marra Mamba iron ore
    mineralisation starting at 48.1m. This hole has been suspended at 48.7m due to a scheduled drilling break.
    Drilling will recommence in 1 weeks time to deepen this priority hole.
    Hole UI 200, located 160 metres south of UI 199, intersected thin mineralisation before ending in BIF at 40
    metres vertical depth.
    Assays are awaited for these holes.
    These holes are part of a series of holes designed to test for eastern and northern extensions of the Railway
    Prospect mineralisation between the discovery line 673080mE and the tenement boundary approximately
    1000 to 1200 metres east of the discovery line.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.