SYR 1.02% 49.5¢ syrah resources limited

And don't forget Vanadium. In the Feasibility Study of 29/5/15...

  1. 687 Posts.
    lightbulb Created with Sketch. 29
    And don't forget Vanadium.
    In the Feasibility Study of 29/5/15
    mention was made as follows
    Vanadium bearing concentrate will initially be sent to the tailings storage facility to minimise construction,Commissioning and processing complexities during start up
    And later
    The Feasibility Study does not consider the vanadium potential of Balama.
    A Scoping Study on the potential recovery and production of vanadium has been completed (referVanadium scoping study of 30/7/14).
    Syrah intends to conduct further vanadium technical studies during the construction and commissioning phase of the Balama Project, with full feasibility studies to commence after successful commissioning of graphite production. High purity vanadium samples produced from Balama pilot plant test work have been sent to a number of major Vanadium Redox Flow battery producers.
    Vanadium overview Here
    Price explosion in Vanadium Here
    Will be interesting to learn if company intend to complete a full feasibility study after commissioning of graphite production
    Last edited by Pedro14: 05/10/17
 
watchlist Created with Sketch. Add SYR (ASX) to my watchlist
(20min delay)
Last
49.5¢
Change
0.005(1.02%)
Mkt cap ! $405.6M
Open High Low Value Volume
50.5¢ 50.8¢ 49.5¢ $2.472M 4.945M

Buyers (Bids)

No. Vol. Price($)
14 187779 49.5¢
 

Sellers (Offers)

Price($) Vol. No.
50.0¢ 20000 1
View Market Depth
Last trade - 16.10pm 28/03/2024 (20 minute delay) ?
Last
49.8¢
  Change
0.005 ( 1.30 %)
Open High Low Volume
50.3¢ 51.0¢ 49.5¢ 1246024
Last updated 15.59pm 28/03/2024 ?
SYR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.