DRA 0.00% 19.5¢ dragon mining limited

Exploration Update 27-Feb-2020

  1. 192 Posts.
    lightbulb Created with Sketch. 8
    Excellent drilling results from Jokisivu and Orivesi:

    Campaign 1

    2.65 metres @ 8.09 g/t gold from 67.75metres in HU/JS-915;

    1.05 metres @ 21.70 g/t gold from 85.50metres in HU/JS-940;

    4.30 metres @ 7.02 g/t gold from 48.00metres in HU/JS-957;

    4.25 metres @ 6.39 g/t gold from 102.30metres in HU/JS-957;

    1.00 metre @ 42.30 g/t gold from 75.60metres in HU/JS-958;

    8.50 metres @ 3.30 g/t gold from 128.90metres in HU/JS-960;

    8.30 metres @ 5.03 g/t gold from 114.90metres in HU/JS-962;

    0.85 metres @ 62.10 g/t gold from 79.25metres in HU/JS-964;

    4.70 metres @ 5.22 g/t gold from 105.05metres in HU/JS-964;

    3.30 metres @ 6.16 g/t gold from 50.65metres in HU/JS-966;

    0.90 metres @ 60.60 g/t gold from 40.90metres in HU/JS-967;

    2.35 metres @ 9.74 g/t gold from 117.95metres in HU/JS-997;

    10.10 metres @ 2.59 g/t gold from 115.10metres in HU/JS-999

    Campaign 2

    0.80 metres @ 127.00 g/t gold from 57.00metres in HU/JS-969;

    6.50 metres @ 17.01 g/t gold from 121.30metres in HU/JS-970;

    0.70 metres @ 30.20 g/t gold from 152.45metres in HU/JS-972;

    0.65 metres @ 30.70 g/t gold from 73.35metres in HU/JS-973;

    2.00 metres @ 28.70 g/t gold from 98.70metres in HU/JS-974;

    1.00 metre @ 20.80 g/t gold from 96.00metres in HU/JS-976;

    7.15 metres @ 5.54 g/t gold from 64.55metres in HU/JS-981;

    9.60 metres @ 5.16 g/t gold from 60.70metres in HU/JS-984;

    1.00 metre @ 92.80 g/t gold from 103.75metres in HU/JS-985.

    Campaign 3

    2.80 metres @ 7.63 g/t gold from 97.00metres in HU/JS-986.

    Current price is HK1.70, about A$0.33

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.