I think that the tight time frames were to do with the transfer...

  1. 2,153 Posts.
    lightbulb Created with Sketch. 99
    I think that the tight time frames were to do with the transfer of chess sponsorship ......which meant it was not possible to have both systems running at the same time (due to sponsorship conflict with HIN).

    Still, it is pretty messy from a management perspective.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.