As I understand they have a problem with the sampling tool jamming in the hole, the drill hole walls would have been damaged and thence further analysis has been stopped. Can someone explain what options they have to re-commence the analysis? E.g. re-drill the well or drill another new one or ? Apparently they can deviate half way down the well and drill a "Side track" as they mentioned. I believe there are directional drills which can be guided to required direction. How long would this take? Looks like they can not do this till next season.
Pardon my ignorance I do not know much about these procedures.
- Forums
- ASX - By Stock
- 88E
- drillers
drillers, page-4
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $125.6M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $64.68K | 11.60M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
204 | 138585506 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 111241946 | 57 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
204 | 138585506 | 0.005 |
122 | 142839952 | 0.004 |
36 | 50301660 | 0.003 |
30 | 57401504 | 0.002 |
15 | 117600002 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 111241946 | 57 |
0.007 | 173483245 | 107 |
0.008 | 85548101 | 63 |
0.009 | 73784973 | 45 |
0.010 | 72205998 | 51 |
Last trade - 16.10pm 29/03/2024 (20 minute delay) ? |
|
|||||
Last
0.6¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.6¢ | 0.6¢ | 0.6¢ | 9994783 | ||
Last updated 15.59pm 29/03/2024 ? |
Featured News
88E (ASX) Chart |