Strategic Energy Resources Limited (“SER” or “the Company”) is pleased to announce the commencement of a
1,500m diamond drill program at the Isa North Project
The Nardoo West target is located approximately 1km NW of Nardoo East and is a combined gravity and magnetic
target modelled with the depth to the gravity shell of 375m (0.7mGal) and the magnetic body at 475m depth (1715nT).
The Nardoo West target is a larger modelled gravity and magnetic response than Nardoo East with a slightly lower
Machine Learning predictive score for hydrothermal magnetite. A 750m vertical diamond hole is planned to test the
target to resolve the source of the geophysical anomaly.
we started drilling on the 29th of September .
management stated it would take 4 weeks to drill .
we are drilling two holes at 750m .
so one hole should be drilled by the13th October.
so that is 14 days drilling to 750 meters ..
so they should be drilling 54 meters a day .
so we have been drilling for 8 days
so we should be at depth of 428 meters .
so we already should of started to drill through the cap at 375 meters ..
any thoughts on this ....???
how wide is the core bit ....
and how deep do we drill before we retool every time ...
Add to My Watchlist
What is My Watchlist?

