GPN greater pacific gold limited

commencement of peak hill gold project

  1. 3,559 Posts.
    Commencement of Reverse Circulation Drilling – Peak Hill Gold Project
    The Reverse Circulation drilling program carried out by the controlled entity, Yellow Rock Resources Ltd (YRR) has been completed and the results of the assays will be published as soon as they are received from the company geologist. (see attached YRR announcement).
    The drill rig has now relocated to the Greater Pacific Gold Ltd, Peak Hill Gold project area and commenced a 2,500 metre Reverse Circulation drilling programme on Saturday 7th July 2007.
    This program has been designed from the valuable information gained in the wide-spaced drilling program carried out in November 2006 and the follow up Geochemical sampling program completed in February 2007.
    These earlier programmes, together identified a 25 kilometre strike length within the target zone.
    Denis McInerney
    Chairman
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.