BMS and YDR free carried

  1. 4,100 Posts.
    lightbulb Created with Sketch. 4
    YDR is 10% free carried to final mining feasibility in the high grade Echo deposit in Basin Minerals Douglas Project.Echo represnts the highest grade resource contained within the project.
    This one needs to be looked at.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.