Chris spot is more like 22k usd . Then you have the opex costs and the loan costs .
also to me, they could have one billion tonnes lce . But on that land size(GR) be only atm 10k lce pa
To increase that is going to be a hell of a
lot of wells in a small space . Is that even possible .
The cloced loop is more a concern to me . So that needs to be proved up assoon as possible
On paradox . Looks still on the cards but still no land allocated for the plant .
no infrastructure lot of pipes to run .
Add to My Watchlist
What is My Watchlist?