Drilling Report - Kenmore 27
Document date: Tue 15 Oct 2002 Published: Tue 15 Oct 2002 17:23:51
Document No: 134577 Document part: A
Market Flag: Y
Classification: Progress Report
BEACH PETROLEUM NL 2002-10-15 ASX-SIGNAL-G
HOMEX - Adelaide
+++++++++++++++++++++++++
Beach Petroleum advises that Kenmore-27 has reached total depth at
1441 metres and will be completed as a Hutton oil producer.
Completion operations are expected to take about 3 days, after which
the rig will move to the Bodalla Sth-14 location.
Kenmore-27 is the first of a two-well development drilling program at
the Kenmore and Bodalla South Oilfields, to be followed by Bodalla
South-14.
Beach Petroleum holds 100% of the Kenmore and Bodalla South
Oilfields.
R Nelson
MANAGING DIRECTOR
- Forums
- ASX - By Stock
- BPT
- Another Oil Strike by Beach Petroleum
Another Oil Strike by Beach Petroleum
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BPT (ASX) to my watchlist
|
|||||
Last
$1.62 |
Change
0.010(0.62%) |
Mkt cap ! $3.672B |
Open | High | Low | Value | Volume |
$1.63 | $1.64 | $1.61 | $4.993M | 3.077M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
35 | 60595 | $1.62 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.63 | 47827 | 27 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
39 | 68570 | 1.620 |
27 | 101298 | 1.615 |
14 | 88244 | 1.610 |
14 | 143315 | 1.605 |
27 | 436082 | 1.600 |
Price($) | Vol. | No. |
---|---|---|
1.625 | 39354 | 21 |
1.630 | 79587 | 33 |
1.635 | 139316 | 23 |
1.640 | 321169 | 18 |
1.645 | 255844 | 13 |
Last trade - 15.16pm 23/05/2022 (20 minute delay) ? |
|
|||||
Last
$1.62 |
  |
Change
0.010 ( 0.24 %) |
|||
Open | High | Low | Volume | ||
$1.63 | $1.64 | $1.61 | 1409372 | ||
Last updated 15.33pm 23/05/2022 (live) ? |
BPT (ASX) Chart |