If the current drilling proves that we have more to add to the JORC. And the exploration holes are good. Could be a brand new Zinc area in the world.
But what I like is the high grade zone is 0.9 grams per tonne gold! I own another project which has nothing else (no Zinc, lead, copper or silver) but 1.0 grams per tonne gold. This is a very good zinc project.
My vote, get rid of Mt Carrington, put a royalty on it. Use the money for the zinc project. If the current drill results are good.
Any comments.
WRM Price at posting:
1.0¢ Sentiment: Buy Disclosure: Held