The feasibility study is being prepared by WPG with technical and engineering inputs from a number of professionally independent consulting companies, each expert in their own field. The feasibility study is considering mining production rates between 250,000 and 350,000 tonnes per annum, mining ore from a single large and a smaller satellite open pit and processing using a proven heap leach approach to the recovery of gold.
Now in the process of making this a reality. Gold out of the ground is worth a lot more on the share price than in the ground - as they say. We shall wait and see what that does to the share price as news of actual gold unfolds in coming months.
WPG Price at posting:
2.6¢ Sentiment: Buy Disclosure: Held