Don't know what updates they'll give, but if the well design is as per F1, I'd assume that the 10-3/4" casing has already been set and cemented, and they are now drilling ahead in the 9-7/8" hole, maybe at around 3,800 ft or so (non problematic basis).
B65 Sand lying approx 6,500 to 6,700 ft TVD (intersected zone), so I'd expect them to be through that and evaluated somewhere around the 20th - 21st. That assumes the same drilling rate between the two different rigs used.
I think if they intersect a pay zone in the B65 sand they'd be keen to tell the mkt asap!....imo.
- Forums
- ASX - By Stock
- Ann: SM 71 F2 Well Drilling Ahead
Don't know what updates they'll give, but if the well design is...
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BYE (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.2¢ |
Change
-0.005(5.75%) |
Mkt cap ! $88.46M |
Open | High | Low | Value | Volume |
8.3¢ | 8.3¢ | 8.2¢ | $4.772K | 57.73K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12500 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.4¢ | 156809 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12500 | 0.080 |
2 | 100000 | 0.079 |
1 | 100000 | 0.078 |
1 | 270641 | 0.077 |
4 | 416931 | 0.076 |
Price($) | Vol. | No. |
---|---|---|
0.084 | 156809 | 2 |
0.086 | 11625 | 1 |
0.087 | 220852 | 2 |
0.088 | 6271 | 1 |
0.090 | 100 | 1 |
Last trade - 15.59pm 29/03/2024 (20 minute delay) ? |
|
|||||
Last
8.2¢ |
  |
Change
-0.005 ( 3.53 %) |
|||
Open | High | Low | Volume | ||
8.3¢ | 8.3¢ | 8.2¢ | 35921 | ||
Last updated 11.26am 29/03/2024 ? |
Featured News
BYE (ASX) Chart |