LNY 10.0% 0.9¢ laneway resources ltd

Once topsoil and vegetation are removed and stockpiled waste...

  1. 2,110 Posts.
    lightbulb Created with Sketch. 102
    Once topsoil and vegetation are removed and stockpiled waste material will be blasted and removed to expose the ore.

    Blasting of the ore will also be required before it is loaded by excavators into articulated mining trucks that will haul the ore 2km’s to the ROM pad.

    The material will will then be loaded from stockpiles into road registered trucks and hauled to the Blackjack processing plant, where it will be processed into gold bars prior to transport to a refiner for refining and sale.
 
watchlist Created with Sketch. Add LNY (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $36.80M
Open High Low Value Volume
1.0¢ 1.1¢ 0.8¢ $237.4K 25.24M

Buyers (Bids)

No. Vol. Price($)
7 1927955 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 10765285 13
View Market Depth
Last update - 16.10pm 21/05/2019 (20 minute delay) ?
(live)
Last
1.0¢
  Change
-0.001 ( 9.09 %)
Open High Low Volume
1.0¢ 1.0¢ 0.9¢ 13026132
Last updated 15.50pm 21/05/2019 (live) ?
LNY (ASX) Chart
GET SUPPORT arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.