K2P 0.00% 18.0¢ kore potash limited

Ann: Excellent Scoping Study Results for the Dougou Project, page-2

  1. 29,050 Posts.
    lightbulb Created with Sketch. 277
    only a scoping study

    capex is ball park ($1M per tonne)

    opex is low $106/t

    nothing mentioned about the same 'back end' with Kola

    in other words, despite Kola (underground mining) & Dougou (solution mining) having different mining methods, the back end processing may possibly be able to use the same plant (but then maybe not)
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.