What they need to do is to dig 2 trenches in parallel in each location, one to 2.7m and one to 5.5m and test the flow in each. This will allow them to determine the flow rates in the lower half 2.7m to 5.5m which has lower specific yield. They should really do this in all locations imo as it will allow them to better optimise their trench network design.
- Forums
- ASX - By Stock
- Ann: Construction of Pilot Trenches Underway
What they need to do is to dig 2 trenches in parallel in each...
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.0¢ |
Change
0.015(11.1%) |
Mkt cap ! $49.38M |
Open | High | Low | Value | Volume |
14.0¢ | 15.0¢ | 14.0¢ | $10.41K | 73.86K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 102596 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 148271 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 102596 | 0.135 |
3 | 132451 | 0.130 |
3 | 107501 | 0.125 |
4 | 156564 | 0.120 |
1 | 4548 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 148271 | 6 |
0.155 | 76782 | 2 |
0.160 | 28000 | 1 |
0.165 | 64166 | 1 |
0.175 | 212790 | 2 |
Last trade - 16.10pm 29/03/2024 (20 minute delay) ? |
|
|||||
Last
14.5¢ |
  |
Change
0.015 ( 3.57 %) |
|||
Open | High | Low | Volume | ||
14.0¢ | 14.5¢ | 13.5¢ | 46083 | ||
Last updated 11.18am 29/03/2024 ? |
Featured News
AMN (ASX) Chart |