@rbj67 sorry for the late reply:
At Plutonic CYL have two gold processing plants:
· A 8Mtpa processing plant (jaw crusher, SAG mill and ball mills) being a 3 Stage hard rock crushing circuit, tailings facility, camp and an unsealed airstrip (being rectified by the Sandfire deal)
· A second 1.2Mtpa processing plant is currently on care and maintenance Firstly all gold processing plants typically involve technologies (equipment) that perform the following: crushing, grinding, gravity separation, flotation, and cyanide leaching.
· To the best of my knowledge (and memory) this 2nd plant will require a new floatation plant and maintenance/repair to the crushing and grinding mechanisms. 6 years ago this was estimated to be around AUD$25m and as PB mentioned 6 months in time as the crow flies.
All IMO DYOR
Add to My Watchlist
What is My Watchlist?