i recall that previous operator ran lots of gold ore from sandfire degrussa through 1st plutonic mill along with plutonic underground ore so as to improve mill recoveries...I can't recall the grade but apparently there was plenty more of it to be had real easy...perhaps 1st mill can be topped off with some of this gold muck from around degrussa since cyl plan for mucking k2, trident, plutonic East is also underground like plutonic so Cyl need open pit feed for 1st mill to get best gold recoveries. Fill the 1st mill to 1.8mmt and aisc at plutonic get crushed. I believe 2nd mill refurb require about 6 months. To my knowledge there is no long lead time items to slow down refurb of 2d mill, I think a lot of piping need to be done on 2d mill. I'm thinking cyl find some Australians to lay some pipe good.
- Forums
- ASX - By Stock
- Ann: Catalyst acquires Old Highway Gold Project
CYL
catalyst metals limited
Add to My Watchlist
4.28%
!
$6.34
i recall that previous operator ran lots of gold ore from...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.