Well this version is a bit easier to understand. Looks very impressive.
Highlights of the Resource Upgrade
● Total Measured and Indicated Mineral Resources of boric acid increased 61% from 17.5M
tons to 28.3M tons with grade of 8.09% (B2O3), an increase of 10.8M tons.
● Total Measured Mineral Resources of boric acid increased 170% from 3.3M tons to 9.1M
tons with grade of 8.34% (B2O3), an increase of 5.8M tons.
● Total Indicated Mineral Resources of boric acid increased 35% from 14.2M tons to 19.2M
tons with grade of 7.97% (B2O3), an increase of 5.0M tons.
● Total Measured and Indicated Mineral Resources of Lithium Carbonate Equivalent (LCE)
increased 54% from 213K tons to 328K tons with 0.17% LCE.
● Implied resource life of 217 years using first phase of production (130K ST per annum) and
excludes inferred resources.
● Project retains optionality for future expansion phases of additional production tonnage.
Ann: 5EA Publishes Updated SK-1300 Mineral Resource Estimate, page-2
Add to My Watchlist
What is My Watchlist?