5EA 5e advanced materials inc.

Ann: 5EA Publishes Updated SK-1300 Mineral Resource Estimate, page-2

  1. 1,080 Posts.
    lightbulb Created with Sketch. 230
    Well this version is a bit easier to understand. Looks very impressive.

    Highlights of the Resource Upgrade
    ● Total Measured and Indicated Mineral Resources of boric acid increased 61% from 17.5M
    tons to 28.3M tons with grade of 8.09% (B2O3), an increase of 10.8M tons.
    ● Total Measured Mineral Resources of boric acid increased 170% from 3.3M tons to 9.1M
    tons with grade of 8.34% (B2O3), an increase of 5.8M tons.
    ● Total Indicated Mineral Resources of boric acid increased 35% from 14.2M tons to 19.2M
    tons with grade of 7.97% (B2O3), an increase of 5.0M tons.
    ● Total Measured and Indicated Mineral Resources of Lithium Carbonate Equivalent (LCE)
    increased 54% from 213K tons to 328K tons with 0.17% LCE.
    Implied resource life of 217 years using first phase of production (130K ST per annum) and
    excludes inferred resources.

    ● Project retains optionality for future expansion phases of additional production tonnage.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.