ROC 0.00% 68.5¢ roc oil company limited

angola

  1. 24 Posts.
    "The Simmons 80 rig commenced drilling the Milho-1 exploration well on 24 November 2007. The well, the first in the current programme to specifically target a pre-salt structure, is expected to reach Total Depth by the end of January 2008."

    Still waiting...
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.