CTP 3.92% 5.3¢ central petroleum limited

How can you be confident the pipeline to Moomba will be built?...

  1. 10,075 Posts.
    lightbulb Created with Sketch. 4851
    How can you be confident the pipeline to Moomba will be built? That pipeline would cost at least $1.2 billion. Most observers don't consider that gas needs to be piped 1100 km to satisfy the east coast market, there are promising developments much closer at hand. As for the 1986 Alice to Darwin pipeline, its a very small diameter affair, Santos was recently talking about the need to lay another pipeline next to it, only cost $1 billion. These pipeline proposals are mostly heard when politicians try to inspire the masses but they rarely become reality. There are far more politically valuable ways to spend infrastructure billions.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
0.002(3.92%)
Mkt cap ! $39.22M
Open High Low Value Volume
5.2¢ 5.3¢ 5.2¢ $31.66K 604.5K

Buyers (Bids)

No. Vol. Price($)
1 86808 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 23813 1
View Market Depth
Last trade - 16.10pm 29/03/2024 (20 minute delay) ?
Last
5.3¢
  Change
0.002 ( 3.92 %)
Open High Low Volume
5.2¢ 5.3¢ 5.2¢ 101711
Last updated 15.33pm 29/03/2024 ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.