M4M 12.5% 0.7¢ macro metals limited

I have a different and probably overly optimistic theory on the...

  1. JPS
    927 Posts.
    lightbulb Created with Sketch. 3
    I have a different and probably overly optimistic theory on the minimal information contained in the feasibilty study.

    I do acknowledge ASX new rules on forecasting (and that may be the orimary reason) however I believe even with Kogi large reserve, there is plenty of similar iron ore in the surrounding region. Mostly undiscovered, but there are other known reserves. So as to prevent any potential competition, the feasibility details will remain unpublished until the last moments before the projects ultimate decision to proceed is about to be made. Even then it will be minimal.

    At some point, probably soon after KFE announces its decision to proceed, other foreign and local conglomerates will move in with the same intension.

    In other words the DIrect Reduction project is highly profitable, but they want to keep the tight lid on it.
    Actually it is so profitable, that 100% debt financing is possible. MTO

    Next 2 months is all the waiting time needed. During which time, information will be announced. All IMHO
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
-0.001(12.5%)
Mkt cap ! $22.62M
Open High Low Value Volume
0.8¢ 0.8¢ 0.7¢ $92.65K 13.06M

Buyers (Bids)

No. Vol. Price($)
20 30168874 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 30211041 16
View Market Depth
Last trade - 16.10pm 29/03/2024 (20 minute delay) ?
Last
0.7¢
  Change
-0.001 ( 0.00 %)
Open High Low Volume
0.8¢ 0.8¢ 0.7¢ 17454175
Last updated 15.01pm 29/03/2024 ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.